Inserts arrived the other day, just thought to show the price, I could've got Capri ones but what's the fun in that !

This is what's inside, 2x new inserts and a lot of padding

So the plan was they'd pop right into the RAV4 towers but was not to be, I had to shave down the bearing locater, as they didn't fit in the lathe I had to do them by hand with a grinder being ever so light and checking as I go, they fit fine now.
The next part is cut the Capri tubes down, and since I need the threaded top part. The theory is to cut the tube in the area but not the same spot as the lower spring platform will be welded but hopefully have the welded tube hidden behind the platform.
The Celica inserts are about 35-40mm shorter than Capri so I cut the tube at the 100mm mark and then cut the top piece to size with the gland nut in so it doesn't bottom out

Tomorrow I've got a home grown tool I'm making to hold the strut tube while welding. It's basically a short length of RHS with holes cut on opposing sides with welded nuts and bolts to hold the tube in place, this should stop the tube from becoming bent . I will Tig the tube together once it's been tacked with a MIG

I hope this little tool will work with exhaust tubes later on...