The Bond roll cage turned up and GDub and I installed it on Sunday. (I say we, but in truth I did very little indeed).
It is supposedly a "Bolt in Cage" but in reality we had to shorten the door bars and the rear wheel arch legs. Once the rear legs were cut they also required welding onto the plates too.
All in all it took us nearly 6 hours all up and I still need to drill the second set of retaining bolt holes.
I am very thankful to have such great guys in the club who are more than willing to help out with things like this though I may have used up a fair bit of good will.
Still needs painting too but I'm off till the 13th so it'll all be done soon.
Cheers,
Matt