Well I have been making progress, but slower than i had hoped. I decided that i needed the motor back in the car to figure out where to put the O2 sensors in the exaust, so i am finishing everything else off as i go so i only have to put it in once(I hope).[%]
The list is shorter but for every job i remember i have to do, i have found another 2 i have forgot about having to do.[B)]
Front coilover struts, finished and refitted again.
Crossmember is all welded up and fitted with the power steering rack totaly fitted also. Just have to make the conecting hoses to the ps pump once the motor is fitted in.
Pully system is all finished and a belt has been aquired for the job.
Water pump has been modified and fitted. just have to make up a couple more heater hoses and its done also.
The next 2 jobs on the list are
1. To finish off the steering column and conection to the rack.
2. clean up the gear box, and reasemble it with the corect length shifter and fill it with oil. then it is on to refitting the motor and sorting out all of the fidely bits.

I will have more photos later when i get time to post them up.[%]