Been a while since I've updated.. Starter in now in and the engine cranks. Throttle bodies linkages work and the fuel rail is 75% finished. Turned out to be a pain in the neck, the fuel rail will end up costing more than the throttle bodies did!! (They were $75). Heres a pic of the inlet manifold with no throttle bodies.

I made up a new frame to mount the fuel pumps and surge tank in the spare wheel well in the boot. Also new fuel lines. Haven't got a pic of it finished, painted and in the boot, will get one later.

Unfortunately the exhaust was worse than I thought. Once it cleared the bellhousing and the crossmember I had a look underneath and it only cleared the body by about 2mm. So I cut it [B)][B)] and welded extensions in. It now has a good amount of clearance to the body. I am very dissapointed in Ashley, I wouldn't recommend them.

I welded a bracket up for the coil and it is mounted and wired in. The wiring is all about 90% done.

Still waiting for my water pump. I'm having someone bring it over from the uk, they are coming Australia day. I need a pulley for it though.
Then just need to finish the alternator mount. Nearly there!!
andrew.