Big thanks to Ken (diff shop) for putting my axles on the lathe, and also pointing out that one of the shafts had no retainer plate under the bearing! That could have ended badly. Lucky for me he had a spare and pressed the bearing off, installed retainer plate & pressed bearing back on.
Once the shafts were in I test fitted a minilite and as suspected, studs were too short.
I had a rummage through some spares I've kept over the years and wallah! From an old hilux project, 20x near new 13mm spline, 12x1.5mm thread and about 20mm longer than the escort studs. So they've been installed and wheels fit really well.
The aim is to get RWC and there's a little left to do.
Back to my panel guy for the last rust repairs.
Fit front seat belts
Replace dodgy bulbs where necessary
Glue on rear vision mirror
Install Webcon service kit on the 32/36 weber
I've recently drained & flushed cooling system and filled with new coolant.
New oil & filter
Drained 20L of stale fuel from tank via the sender unit aperture. Man did that stuff stink.
I've got a good drop tank to replace which has been primed & painted. A new brass float is on the way for the fuel sender (ebay) but the windings will have to be redone by automotive instrument specialist.