picked up my car from extreme custom engineering on Saturday... couldnt wipe the smile off my face... so happy with how everything turned out...
that was the last lot of major fabrication work.
wat i had done was: 6point chromolly cage bolt in side intrusion bars, hilux diff cut down disc rotors fitted and axels resplined, 'modified the rear tubs', he replaced the 2 front footwells, shaved the rear pillar vents and other bits and peices of rust and filled uneeded holes etc.
heres som pics...





