2012/01/10 21:22:53
krt10
leafs are made by king springs. they have a anti rebound half leaf. when run with good shocks and bushes they are supposed to be very good at eliminating tramp. i guess ill find out soon though.
 
im just building it the way ive always wanted to build an esky.  but ill probably run some IP rounds. (ill have to change a few things for that . like id have to get rid of the compression struts and adj control arms. but as a whole it should fit into IP regs pretty well)
2012/01/10 21:50:49
ratta tat tat
If you ever consider another user name, I think 'escort mad' would suit well
2012/01/10 22:41:44
krt10
haha well you've gotta have a passion.
that user name came from when i raced dirt karts years ago. i was number 10. (incidentally i also got 10th at the aus titles one year. so it worked well)
2012/01/10 22:52:08
ratta tat tat
Wow, that's a great placing. And now your green machine will take racing to the next level! That's some good info. For a long time I thought krt10 meant Kurt low hahaha. I've spent too much time deciphering personalised plates
2012/01/20 21:09:06
krt10
another little update.
 
switch panel is almost complete. ive also sent of the drawing to get the guage panel cut. should look really nice once done.

 
also got another shipment of parts sent today so i will be able to make the fuel lines very soon and finish off the engine bay.  its all getting very close :)
2012/01/20 22:18:02
ratta tat tat
Great to hear Scott. You must be wrapped with how everything's coming along.
2012/01/22 19:23:10
mead67
unbelivable build makes me happy just looking at the pictures
2012/01/28 18:59:28
krt10
thanks guys.  
got a new shipment of parts the other day

wiring is getting closer to being complete. did a bit more work, all the auxiliary's work now (ie, lights,fans,fuel pump) it also cranks over :)
i also started playing around with the throttle linkages and fuel lines. here is what i have so far

 
still need to run the fuel line to the pump and tank. also next on the list for electrical is getting the ignition sorted.
still lots to do
 
cheers
 
2012/02/08 18:53:59
krt10
engine bay is 95% done. still a few more jobs to do like neatening up the wiring, running rad hoses, ect. but its getting close now.

 
also finally got the guage panel made. i think it looks pretty good.

 
 
ive run the fuel line now too and have orded a fire bomb.
its getting very close now. 7 days till the deadline i set myself to get it started. then itll go off to the dyno to get run in/tuned.
 
cheers
2012/02/18 00:57:18
krt10
well it  runs!!!!!

got the motor fired up on monday night, now it needs to be run in on the dyno. getting everything sorted for a dyno session on monday (hopefully, circumstances permitting)
 
after having a car burn down on me a fire bomb was a must. i fitted that today and plumed it up. still need to fit the pull cords

 
the windscreen and quater windows are now fitted and i fitted the bonnet today

 
wiring for the guages is now complete. the dash turned out well in my opinion.


 