A small update where the tubs and boot were prepped and painted.



With the bigger tubs the rear legs of the cage had to be changed. The harness bar is now welded into the hoop.

The alloy drop tank is now bolted in. Really like the way that has turned out.


Running gear is now complete with the installation of the T5 gearbox.
Having the auto tunnel made life so much easier, it didn't need any further mods and there is still room around the box.
We made up some new gearbox mounts and used the original crossmember that came with the box to bolt it in.


As you can see the hole for the gear lever had to be enlarged a bit, but it all looks good with the quick shifter installed.

Measured up the tail shaft and it needs to be shortened by 2.5 inches, so that's this weeks job.