Ok. To my suprise I got a call today telling me the machining was done and to bring a huge wad of cash and come get it!
So the list of work was.
Block, tunnel bore mains, bore and hone .5mm oversize, very light skim of the deck.
The skim allowed me to go to a cometic mls head gasket.
Rods, Resize big ends, new small end bushes and balance.
Crank, After 24 years and 135000miles the crank was std std. And im glad to say it still is std std. All it was given was a light polish. The machinists were very excited about the cranks condition. It passed all there straightness and crack tests. They then balanced it up with flywheel,clutch, crank pulley ect . All good.
Here are the pics.
Block wraped in plastic! It will be running ARP main studs and head studs.

Rods with new ARP bolts, new little end bushes, resized & balanced

Std, Std crank, polished and balanced.

Now its time for cleaning, measuring, measuring, cleaning, cleaning and assembly! Probably more cleaning before assembly.